Neon drop · Free ship $75+ · Enter the grid
Signal · Product Feed

Basement to First Floor Size:XS debris and a rusted pipe

SKU: 99157417867

4.7
USD100.00 USD149.00

Pay in 4 interest-free payments of $25.00 Learn more

Shipping Estimate
USA
  • USA
  • CAN

Ships within 48 hours · Estimated delivery Aug 13 - Aug 18

Live Spec

Basement to First Floor Size:XS debris and a rusted pipeA stairwell opening choked with collapsed office chairs, timber boards, and broken furniture, concrete block walls covered floor to ceiling in graffiti tags. This was the basement level of ABBCO Bakery in Leichhardt, photographed in 2015 while the factory sat abandoned. By 1973 the building housed two roll machines producing six thousand dozen rolls per hour. Part of the ABBCO Bakery series.

Store: avramcheva.com · Domain: avramcheva.com

Description

debris and a rusted pipe cover the floor

the main lube pumps

Bunny tails push through cracked concrete in a forgotten corner of the Sundell Holden workshop and service centre on Smith Street

The space sits above a site that operated from 1884 until August 1988

The feeder bin house at Box Hill Brickworks: corroded metal and peeling paint on a structure that fed raw clay into the brickmaking process

Basement to First Floor Size:XS debris and a rusted pipeA stairwell opening choked with collapsed office chairs, timber boards, and broken furniture, concrete block walls covered floor to ceiling in graffiti tags. This was the basement level of ABBCO Bakery in Leichhardt, photographed in 2015 while the factory sat abandoned. By 1973 the building housed two roll machines producing six thousand dozen rolls per hour. Part of the ABBCO Bakery series.

Exchange/Return Notes
  • We offer a 30-day return/exchange service after receiving.
  • Final sale items are not eligible for returns or exchanges.
  • To process your return/exchange, please contact us at [email protected]
  • Please click here for more details>>> Return & Exchange Policy

You may also like

recommand products